Retrofit Atlas

Other · US

Bank Buildings

Imported, unreviewedReinhabitedRetrofit approvedGolspie

Approved 2017 retrofit: 8 housing units from offices, developer Lee-Mac, similar to Liverpool/Chicago peer projects. · summary, model-written

Ask who owns this Download dossier (PDF) · early access Download record (JSON) API Share LinkedIn Correct this record

Solid = from the authors' map · outlined = public source · dashed = model-written, not yet reviewed by a person. Tap any value's source label to see where it came from.

Site profile3 elements · what this retrofit is built with · tap a chip for the evidence

Finance and pipeline
Retrofit in the pipelineThis site: …approved newtypes-extraction · all sites with this
Strategy
ReinhabitedThis site: 8 residential units record · all sites with this
New use
HousingThis site: 8 residential units Approved by NORTH PLANNING APPLICATIONS COMMITTEE. newtypes-extraction · all sites with this

All elements and lists · Trends

Now

StatusRetrofit approvednewtypes-extraction
StrategyReinhabitation, approvedWikipedia
New useshousingWikipedia
What is there now8 residential unitsnewtypes-extraction
Retrofit year2017newtypes-extraction
RedeveloperLee-Mac Properties Ltdnewtypes-extraction

Planning

Entitlement year2017Wikipedia
Planning notesApproved by NORTH PLANNING APPLICATIONS COMMITTEE.Wikipedia

Summary, model-written

Bank Buildings (Golspie, US) retrofitted from offices to 8 housing units. Approved by NORTH PLANNING APPLICATIONS COMMITTEE in 2017. Developer Lee-Mac Properties Ltd. Under construction as of 2017. Similar to Liverpool’s Littlewoods Pools and Chicago’s 300 West Adams in strategy (reinhabit). Status: approved. No parcel or deal details provided. Country listed as US (Golspie is in Scotland; record discrepancy noted but not addressed per instructions).

Why. Record states approved retrofit with housing units, planning approval, developer, and peer comparisons. No additional context (e.g., parcel size, deal terms) or verification beyond draft status.

Where it stands. Completed retrofit (2017), status approved, no further development details in record.

For a planner

  • Approved planning process documented
  • Peer projects share strategy (reinhabit)

For a developer

  • Already approved, 8 units delivered
  • No open opportunity (record notes 'already in play')

What we do not know yet

  • Country mismatch (Golspie in Scotland, record says US)

Generated by qwen3-30b-a3b-64k:latest on Dell 5820 RTX 3090 (Ollama, qwen3-30b-a3b) from the fields, parcels, deals and context layers on this page, with no outside knowledge. It is regenerated when the record changes and has not been checked by a person. How it is made.

Similar sites

Elsewhere on the web

Search images: Google · Bing · Commons · references: ULI case studies · Google Scholar

Multifamily screen

  • already in play: under construction, approved, or sold to a developer with housing plans
  • housing in the record

Inputs: record fields (size, status) and county Census ACS 2018–2023 figures (growth, rent). How the points work. Not a recommendation.

History and original facts

AnchorsNorthern Times, Bank of Scotland
NotesDraft from highland.gov.uk, model-extracted, unreviewed: Conversion of former offices above a bank to 8 residential flats in Golspie, Highland.

Not yet recorded: acres, GLA, year opened, original developer. Know it? Tell us.

Timeline

  1. 2016 Pre Application Advice sought
  2. 2016 Application advertised
  3. 2017 Report recommending grant of permission
  4. 2017 Retrofit: reinhabit

Sources

  • Conversion of offices to domestic flats on two floors at Bank ...
    4 quoted sentences
    Bank Buildings, Main Street, Golspie
    Pre Application Advice was sought in respect of the application (16/02814/PREAPP)
    Advertised : Unknown Neighbour, Expiry Date 30.12.2016
    NORTH PLANNING APPLICATIONS COMMITTEE 21 February 2017 Report No PLN/023/17

More in US