Retrofit Atlas

Garden apartments · Texas

Draper

Imported, unreviewedRedevelopedRetrofit approvedGarland, TX

Approved 155-unit residential project (The Draper) on former cafeteria site, active in Garland with median rent $1,469; nearby housing demand confirmed but timeline unknown. · summary, model-written

Ask who owns this Download dossier (PDF) · early access Download record (JSON) API Share LinkedIn Correct this record

Solid = from the authors' map · outlined = public source · dashed = model-written, not yet reviewed by a person. Tap any value's source label to see where it came from. documented = a quoted excerpt (click to read it) · reported = a source named, no excerpt yet · no source.

Map view. No verified photo yet. Send one.

Site profile4 elements · what this retrofit is built with · tap a chip for the evidence

Finance and pipeline
Retrofit in the pipelineThis site: …approved newtypes-extraction · all sites with this
Place
County permitting 2,000+ apartment units a yearThis site: 6,824 units, Dallas County census-bps · all sites with this
Strategy
RedevelopedThis site: The Draper, a three-story, 155-unit residential complex record · all sites with this
New use
HousingThis site: The Draper, a three-story, 155-unit residential complex Approved by City of Garland. newtypes-extraction · all sites with this

All elements and lists · Trends

Now

StatusRetrofit approvednewtypes-extraction reported
StrategyRedevelopment, approvedWikipedia no source
New useshousingWikipedia no source
What is there nowThe Draper, a three-story, 155-unit residential complexnewtypes-extraction reported
RedeveloperGroundFloor Developmentnewtypes-extraction reported

Planning

Entitlement year2020Wikipedia no source
Planning notesApproved by City of Garland.Wikipedia no source

Site context

Housing permits, Dallas County (TX), 20246,824 units in 5+ unit buildings, 232 in 2–4, 5,655 single-family; 2023: 7,855 in 5+Census BPS
Other atlas sites nearby1 within 10 km, 12 within 25 km: Richardson Square Mall (5.8 km)computed
Retail trade in the county, 2025 (BLS QCEW)144,905 jobs in 8,234 establishments; average annual pay $51,455; employment location quotient 0.80; employment -1.9% on the yearBLS QCEW 2025, NAICS 44-45, private
Jobs located in the tract, 20223,070 jobs; 262 in retail trade, 356 in accommodation and food (workplace blocks summed to tract 48113018802)Census LEHD LODES8 WAC 2022
Upward mobility (Opportunity Atlas, 2010 tract)children of low-income (25th percentile) families reached the 36th income percentile as adults; 3.4% incarcerated at the 2010 count (141 children in the sample); born 1978–83, measured 2014–15Opportunity Insights
Food access (USDA FARA 2019, 2010 tract)not a low-access tract at 1 mile; poverty rate 18.8%; median family income $45,395; 62 SNAP householdsUSDA ERS
SchoolsGarland Independent School District (PK-12); 5 public schools within 1 mile: BUSSEY MIDDLE; PATHFINDER ACHIEVEMENT CENTER; FREEMAN EL; GARLAND H SNCES EDGE
Elevation546 ft above sea level at the site pointUSGS 3DEP
Storm events in the county, 2016-2025481 county-logged events: 196 hail, 140 thunderstorm wind, 113 flash flood, 12 lightning; $3,336,586,500 property damage reported; 8 direct deaths; forecast-zone events (most flood, winter and heat) not countedNOAA Storm Events
Homes for sale in ZIP 75040, 2026-09median list price $305,000 (-1.5% on the year); 141 active listings; median 57 days on market; 27% with a price cutRealtor.com Research
Retail trade in the county, 2012 to 20237,783 establishments (+3%); 136,741 jobs (+20%)Census CBP
Housing market in the countytypical home value $304,821 (-2% 1 yr, +12% 5 yr); typical rent $1,653/mo (+1% 1 yr), 2026-09Zillow Research

Summary, model-written

Redeveloped vacant former Wyatt Cafeteria into 155-unit garden-apartment complex (The Draper) approved by Garland in 2020. Developer: GroundFloor Development. Status: Approved, under construction (per context).

Why. Median rent $1,469 aligns with local housing market (ZORI $1,653). Nearby projects: Richardson Square Mall (6km, under construction) and 11 others within 25km.

Where it stands. Project is active (not speculative), but exact completion timeline unknown. Verified status is draft.

For a planner

  • Approved by city
  • Nearby housing projects (12 within 25km) indicate market demand

For a developer

  • Median rent $1,469 matches ZORI
  • No new construction data beyond 2024 permits (2024: 5,655 units total)

What we do not know yet

  • Construction start/completion date not specified
  • No occupancy rate or timeline in record

Generated by qwen3-30b-a3b-64k:latest on Dell 5820 RTX 3090 (Ollama, qwen3-30b-a3b) from the fields, parcels, deals and context layers on this page, with no outside knowledge. It is regenerated when the record changes and has not been checked by a person. How it is made.

Similar sites

Elsewhere on the web

Search images: Google · Bing · Commons · references: ULI case studies · Google Scholar

Multifamily screen

  • already in play: under construction, approved, or sold to a developer with housing plans
  • median rent $1,469
  • housing in the record

Inputs: record fields (size, status) and county Census ACS 2018–2023 figures (growth, rent). How the points work. Not a recommendation.

History and original facts

CountyDallas County
Census division7 · West South Central
NotesDraft from garlandtx.gov, model-extracted, unreviewed: The vacant former Wyatt Cafeteria on a 4-acre site at the northwest corner of South Garland Avenue and West Avenue B in Garland, TX is being redeveloped into The Draper, a 155-unit residential complex.

Not yet recorded: acres, GLA, year opened, original developer, retrofit year. Know it? Tell us.

Sources

More in Texas