Retrofit Atlas

Industrial sites · England

JCB site (in the centre of Uttoxeter)

Imported, unreviewedRedevelopedPartly retrofittedUttoxeter, England

Partial 2016 retrofit of former industrial site (closed 2009) toward mixed-use; peers show similar strategy but no local success metrics. · summary, model-written

Ask who owns this Download dossier (PDF) · early access Download record (JSON) API Share LinkedIn Correct this record

Solid = from the authors' map · outlined = public source · dashed = model-written, not yet reviewed by a person. Tap any value's source label to see where it came from. documented = a quoted excerpt (click to read it) · reported = a source named, no excerpt yet · no source.

Map view. No verified photo yet. Send one.

Site profile5 elements · what this retrofit is built with · tap a chip for the evidence

Strategy
RedevelopedThis site: record · all sites with this
New use
HousingThis site: …new_use field record · all sites with this
OfficeThis site: …new_use field record · all sites with this
Park and open spaceThis site: …new_use field record · all sites with this
Retail (continued)This site: …new_use field record · all sites with this

All elements and lists · Trends

Now

StatusPartly retrofittedWikipedia no source
StrategyPartial RedevelopedWikipedia no source
New useshousing, office, park, retailWikipedia no source
Retrofit year2016newtypes-extraction reported

Summary, model-written

Closed 2009 (original manufacturing use). Retrofit began 2016 to redevelop as housing, office, park, retail. Status: partial. Verified as draft.

Why. Peer comparisons show similar strategy: 5.5/5.0 scores for malls closed 2006-2013 (e.g., Midtown Plaza, Rochester; Fashion Mall, Plantation) with same 'redevelop' strategy. No parcel/deal details provided. Uttoxeter context limited to basic town description. Unknown: exact retrofit progress, current occupancy, or local planning approvals.

Where it stands. Early-stage redevelopment (partial) with no verified completion data. Peer benchmarks suggest typical post-closure timeline but no local context on success factors.

For a planner

  • Closure year (2009) and retrofit start (2016) align with common post-mall transition timelines. Peer data shows similar strategies succeed at 5.0-5.5 scores but lacks site-specific viability metrics.

For a developer

  • New uses listed (housing/office/park/retail) are standard for industrial-to-mixed-use conversions. No deal terms or parcel boundaries in record. Status 'partial' indicates ongoing work; 'draft' verification suggests incomplete due diligence.

What we do not know yet

  • No data on current occupancy, financials, or planning hurdles. Peer scores don't confirm success in UK context. Industrial-to-retail conversion risks unaddressed.

Generated by qwen3-30b-a3b-64k:latest on Dell 5820 RTX 3090 (Ollama, qwen3-30b-a3b) from the fields, parcels, deals and context layers on this page, with no outside knowledge. It is regenerated when the record changes and has not been checked by a person. How it is made.

Similar sites

  • Midtown Plaza, Rochester, NY · Malls · closed 2008; same strategy: redevelop
  • Fashion Mall, Plantation, FL · Malls · closed 2006; same strategy: redevelop
  • Crestwood Court, Crestwood, MO · Malls · closed 2013; same strategy: redevelop
  • Frederick Towne Mall, Frederick, MD · Malls · closed 2013; same strategy: redevelop

Elsewhere on the web

Search images: Google · Bing · Commons · references: ULI case studies · Google Scholar

History and original facts

Closed2009newtypes-extraction reported
NotesDraft from Wikipedia, model-extracted, unreviewed: The former JCB site in Uttoxeter, demolished in 2009, has been redeveloped with a Waitrose (2016) and Aldi (2022), and has approved plans for homes, a park, and business units.

Not yet recorded: acres, GLA, year opened, original developer, what is there now. Know it? Tell us.

Background

Uttoxeter ( yoo-TOK-sit-ər, locally also UUTCH-it-ər) is a market town and civil parish in the East Staffordshire borough of Staffordshire, England.

Excerpt from Wikipedia (authors and history), CC BY-SA 4.0. May be older than the record above.

Timeline

  1. 2009 Closed
  2. 2016 Retrofit: redevelop

Sources

  • Uttoxeter · CC BY-SA 4.0
    1 quoted sentence
    The JCB site in the centre of Uttoxeter

More in England